Leave a comment

Ontario adding 3,300 MW of renewable energy by 2015: IESO | Canadian Manufacturing

The organization in charge of Ontario’s power system said more than 3,300 megawatts of renewable energy will be added to the grid by the spring of 2015.

Tech Triangle‘s insight:

Renewable energy sources—wind and solar installations and biomass stations—that go online in Ontario between December 2013 and May 2015 will be used to offset the loss of about 2,150 MW in generation capacity from the shutdown of coal-fired generators over the same time, according to the Independent Electricity System Operator (IESO).

See on www.canadianmanufacturing.com

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: